Our team completed the concrete placement for two duplex foundations simultaneously, both constructed with 6-inch-core ICF wall systems. Stepped elevations ranging from approximately 4 to 5 feet required carefully sequenced pours, controlled placement, and close coordination between crews and concrete deliveries across both buildings.
Our team completed the concrete placement for two duplex foundations simultaneously, both constructed with 6-inch-core ICF wall systems. Stepped elevations ranging from approximately 4 to 5 feet required carefully sequenced pours, controlled placement, and close coordination between crews and concrete deliveries across both buildings.
2026 (Planning)